Tasito
Black flat-bed van with the sides dropped

Construction and engineering courier services

Materials to site and production parts between plants, moved on the day with the offload agreed before the vehicle leaves rather than on arrival.

Usual vehicleFlat bed
HandlingKerbside, forklift or crane-off
AccessSite inductions and gate slots
Longest load4.2m enclosed, 2.7m flat bed
What we usually carry
Steel, timber and boardsPlant and machinery partsSite consumables and fixingsPalletised production partsMachined and fabricated itemsTooling going out for repair

Two kinds of job sit on this page and they come from the same place. On site, a merchant is out of stock or a part has failed and a trade is being paid to stand and wait. In a works, a line is down or a customer order is late, and the part that fixes it is forty miles away on somebody's bench. Both are a gap, and the job is to close it with a dedicated vehicle rather than a network.

What we move to site

Steel, timber and boards. Plant and machinery parts. Site consumables and fixings, the unglamorous things a job stops without. Tools going out for repair and coming back. We load at the merchant, the depot or the yard, and we deliver to the gate.

What we move between works

Palletised production parts between plants. Machined and fabricated items going to the customer who ordered them. Finished goods out to a booked slot at the far end. Tooling going out for repair, which is the one most likely to be urgent, because the machine it belongs to is usually stopped while it is away.

Getting on to a construction site

This is where the service is won or lost. Tell us the access and the offload when you book: the gate times, the offload method, any slot that has to be booked, and who signs for it. That is what decides the vehicle, and it is what stops a van turning up that nobody can unload.

Where the site runs inductions, say so and name the contact. A driver who arrives without what the gate wants is a driver sitting at a barrier while your trade is still waiting.

What we send to site and works

For length rather than weight, the flat bed takes 2.7m at 800kg and loads from the flank, which matters when a piece cannot be swung round inside a body. Enclosed, the extra-long wheelbase gives 4.2m and the long wheelbase 3.3m. For palletised work the Luton holds six pallets at 1000kg in 4.2m by 2.0m by 2.1m, with the curtain-side version loading along its flank for a forklift and the box version carrying a tail lift for a site with no handling equipment at all.

The fleet page has every class with its figures, and UK pallet sizes explained sets the standard footprint against the Euro, which is worth checking before a pallet goes to an address with a narrow gate.

What we do not do on site

We do not lift, place or install. The driver delivers to the point agreed at booking and the signature is where our part finishes. Where something has to be carried into a building or up a floor, that is two-man delivery and it needs booking as such from the start, because a crew cannot be found once the vehicle is already outside.

We also do not pack or crate, and we do not provide lifting equipment. Where the offload needs a crane or a forklift, it is the site's.

What we need before a site delivery

Both addresses, what is moving, its dimensions and weight, and what happens at each end. The deadline as a real time rather than a working day. For a site, the gate times, the induction requirement and the offload method. For a works, the booked slot and the goods-in contact.

What construction transport costs

Priced on the road distance and the vehicle, with the price given before you book rather than after the job. Weight is not a factor and never has been.

Frequently asked questions

Yes, where you tell us what the gate needs. Give us the gate times, the induction requirement and the name of the contact when you book, and the driver arrives holding what is asked for rather than queuing at a barrier while your trade is still standing. Sites vary a great deal on this, and we would rather ask three questions at booking than lose an hour on arrival.

The site does, by forklift or crane, unless you have booked a vehicle with a tail lift. The driver delivers to the point agreed when you booked and waits to be offloaded where that was part of the arrangement. Lifting and placing the load is outside what we do, so if there is no handling equipment at that end it needs saying before the vehicle is chosen.

Enclosed, 4.2m in the extra-long wheelbase. On the flat bed, 2.7m at 800kg, loading from the side rather than through a rear door, which is what makes it the right vehicle for a piece that cannot be swung round inside a body. If the item is longer than either of those, give us the real dimensions and we will say plainly that it is beyond us rather than guess.

Call us. Bookings run until 4pm, Monday to Friday, and we will tell you where the nearest suitable vehicle is rather than quote you an average. On a stopped line the collection address matters as much as the delivery one, so have the subcontractor's postcode and a contact there ready when you call. That is the difference between a vehicle moving in ten minutes and one moving in an hour.

Yes, and it is one of the more common jobs on this page. Two legs on separate days is the normal shape, out to the repairer and back once the work is done. Where that movement repeats, which with tooling it usually does, we can price it as a planned route instead of two fresh bookings every time. Tell us the pattern and we will quote the pattern.

Yes. Give us the slot and the reference and we work the collection time backwards from it, with the traffic on the route built in rather than assumed away. A vehicle arriving after a window has closed has delivered nothing and usually has to return the following day, so the slot is the fixed point we plan around rather than our own cut-off.

Not sure which one fits you?

Tell us what you move and how fast it has to get there. We will tell you which vehicle fits and what it costs.

Get a quote